电动汽车充电站的设计必须考虑许多不同的因素,从充电车辆的类型到所需的接口和交易系统,再到无线通信。在有顶棚和地下停车场等区域,网络通信所使用的方法和协议需要特别考虑。

请花一点时间填写下面的表格,并立即获得本次网络研讨会的录音。
 封面页

网络研讨会录音

在覆盖地点设计电动汽车 (EV) 充电站网络

May 19, 2023 | Length: 57:45

电动汽车充电站的设计必须考虑许多不同的因素,从充电车辆的类型到所需的接口和交易系统,再到无线通信。在有顶棚和地下停车场等区域,网络通信所使用的方法和协议需要特别考虑。

Watch our recorded webinar to learn from experts at FLO EV Charging and Digi International about the ecosystem of components and protocols that must come together for connectivity to EV charging stations — especially in areas that have limited cellular access.

Digi supports EV charging OEMs like FLO with a range of secure, robust, embedded systems, including Digi XBee® wireless communication modules, Digi gateways, and the Digi ConnectCore ecosystem of SOMs, as well as wireless design and device management services.

与 Digi 联系

想进一步了解 Digi 如何为您提供帮助?以下是接下来的一些步骤:

 

网络研讨会后续问答

Thank you again for attending our session with FLO EV on navigating the design challenges of EV charging station devices and networks. Here are the questions that followed the presentation and their answers. If you have additional questions, be sure to reach out.

Moderator: Chloe Theobald, Events & Content Director, Charged EV Magazine

演讲者

  • Qiyuan Zhou, Application Engineer, FLO EV Charging
  • Bob Blumenscheid,Digi International 高级产品营销经理

How does the load sharing work with the FLO chargers’ communication? Is it with the electrical, or with Cat 5, 6 signal feedback from the chargers?

Qiyuan: The chargers are connected to the gateway through the Zigbee mesh network. And the gateway itself acts as the site controller. So, the chargers would send the commands, or the information, to the gateway over that Zigbee network, and the gateway would then send commands back through that same Zigbee network, about how to share the power.

What happens to the gateway site controller functionalities for PowerSharing and PowerLimiting when it loses connection to either the Internet or the chargers?

Qiyuan: If the gateway loses connection to the Internet, that's not a problem, because all the controls are local to the gateway, so there's no server-side calculations going on. So, if the gateway loses connection to the Internet, the PowerSharing and PowerLimiting functionalities stay intact. And that's one of the advantages of having the programmable gateways at the sites. And if the connection on the Zigbee network is lost, between the chargers and the gateway, then the chargers are programmed to have a default power draw. So, if the connection is lost, then the chargers default to that lower power rating, so that the circuit doesn't trip.

Bob: Adding to that, there are some questions about security. And Digi XBee® modules do implement security. The Zigbee protocol includes encryption of messages. And then, Digi has a TrustFence® security platform, where we leverage features on the XBee module that provide secure boot and authentication and root of trust, which allow you to make sure that a mesh network is completely secure.

Is there a limit for cable run lengths for the hardwired options? And what are some options for scenarios in which the gateway at the parking site is very far from a building router, or a cellular router?

Qiyuan: So, there is a limit, and that's from the Cat 5, Cat 6 standard. That limit is 100 meters, or about 300 feet. If you have a cable run that's longer than that, we recommend using either Ethernet signal boosters throughout your run, or you can buy a fiber optic cable with the transceivers on either end to plug into the gateways.

Who does that site assessment and site survey?

Bob: That’s a good question, Qiyuan. When your EV chargers are installed, are they designed so that they just work, or do you have tools for installers to make sure that the signals are okay and everything's working in the mesh network?

Qiyuan: Usually, we tell our installers it's up to them to evaluate the signal strength on-site. And that can be done using an app on Android phones, and for iPhones, you can enter the field service mode by dialing a code. So, usually, the installer would be the one to handle that. And one thing to note when doing that is you have to make sure that your installer is checking the signal strength on the same network that the gateway will be deployed on. It seems pretty obvious, but sometimes we have run into issues. So, in the U.S., we use AT&T, and in Canada, we use Bell and Telus.

Bob: And Digi's XBee tools include tools installers can use to check the mesh networking and make sure everything's working okay. But I think that's probably part of the design process of antenna placement and other things that are taken care of, so that the FLO products work.

 

At which level would you limit the power? Would you trip local breakers defined by priority? Or will it trip the main breaker in the main panel?

Qiyuan: So, all of the PowerSharing and the PowerLimiting features are software-based, so they don't actually trip any of the physical breakers. PowerSharing is meant for scenarios where you're over-subscribing a circuit. So, for example, you have two 30-Amp chargers on a single 40-Amp breaker.

So, in that case, PowerSharing is set up so that the total current draw between those two chargers never exceeds, you know, the protection level of that 40-Amp breaker. And for the PowerLimiting, that one is not meant as a circuit protection feature. It's more meant to avoid demand charges. So, the site owner would set a current limit that they don't want the chargers at the site to go over. And then the site controller will make sure that between all of the chargers at that site, that current limit is not exceeded.

Tell us more about LoRaWAN and other mesh technologies that are possible.

Bob: There are a lot of emerging mesh technologies right now. Digi has worked with Zigbee for about 20 years, so it's a very well-known, very understood mesh technology. We are working on LoRaWAN, as a new XBee, and a way to deploy systems as well. So, we'll have some of that later this year. And we're watching some of the other mesh networking technologies that are emerging, things like Matter, that will allow chargers to be put onto a home smart network, and other ones. We will be releasing products as those become viable. It's certainly on our roadmap to track those.

How does FLO allow more than one port on a circuit breaker and still meet the code requirements?

Qiyuan: In the code, there is a provision that if you over-subscribe a circuit, that's okay as long as you have an automatic load management system. So, that automatic load management system is our PowerSharing algorithm, which is hosted on the Digi gateway.

Is the FLO charger designed to receive signal to limit the power output?

Qiyuan: Yes, it is designed to do that over the Zigbee network, and the gateway sends that signal to limit the power output in the case of PowerLimiting or PowerSharing.

This question is about FLO or Digi equipment providing surge protection for spikes or noise on the charging circuits.

Qiyuam: I do believe, for the FLO chargers, there are protections in place. I know for our DC chargers, there's a window in which we can tolerate some, you know, surges or spikes, and also noise. And Bob, maybe you can comment on Digi's side?

Bob: On the Digi side, the power supply would have those protections, and then everything else is connected to the gateway wirelessly. So, I think that's okay. And the Ethernet is protected as well.

This question is about having a mixed gateway deployment with cellular connections on the first level of a parking garage, where there is cell signal, and then hardwired options on the lower levels, where a signal might be weaker.

Qiyuan: So, it is possible, but in practice, we usually don't recommend it because it tends to add confusion for installers. So, yeah, usually... It's possible, but not recommended.

获取我们的白皮书
了解IoT 嵌入式设备架构

相关内容

Empowering the Future: Designing Secure and Remotely Managed Electric Vehicle Chargers Empowering the Future: Designing Secure and Remotely Managed Electric Vehicle Chargers In this webinar, experts from ByteSnap Design’s EV charging division, Versinetic, and Ventus Wireless delve into the intricate... 录制的网络研讨会 OEM Solutions to Power EV Charging Stations OEM Solutions to Power EV Charging Stations In our EV Charging demo at DISTRIBUTECH 2024, we highlight the power of Digi ConnectCore®. The ConnectCore 8M Mini system-on... 观看视频 在产品设计中集成语音控制功能 在产品设计中集成语音控制功能 适用于各种商业应用的互联产品设计可从语音控制技术中获益,从而实现... 观看视频 电动汽车充电行业中原始设备制造商的嵌入式市场机遇 电动汽车充电行业中原始设备制造商的嵌入式市场机遇 如今,由于基础设施网络的不断发展,电动汽车充电市场呈爆炸式增长。 录制的网络研讨会 电动汽车充电站设计 - OEM 市场机遇与解决方案 电动汽车充电站设计 - OEM 市场机遇与解决方案 电动汽车市场发展迅速,这意味着对电动汽车充电站的需求巨大。原始设备制造商和独立... 阅读博客 IoT 建筑:评估需求并选择正确的解决方案 IoT 建筑:评估需求并选择正确的解决方案 要为项目选择合适的IoT 架构,就必须评估连接需求、可用技术以及部署和维护应用程序所需的技术和运营资源。 查看 PDF 长距离无线通信与短距离无线通信:什么最适合您的项目? 长距离无线通信与短距离无线通信:什么最适合您的项目? 无线无线电通信的范围取决于许多因素,包括预定使用案例的位置、是否是... 阅读博客 您需要一个IoT 网关:您应该自建还是购买? 您需要一个IoT 网关:您应该自建还是购买? 准备好设计、构建和部署采用 Digi XBee® 网状网络的产品了吗?什么样的IoT 网关最符合您的需求? 观看视频 Digi XBee 生态系统|探索和创建无线连接所需的一切 Digi XBee 生态系统|探索和创建无线连接所需的一切 完整的Digi XBee 生态系统包括射频模块、代码库和屡获殊荣的工具套件Digi XBee Tools。 查看产品 无线网状网络 Zigbee 与 DigiMesh 对比白皮书 无线网状网络 Zigbee 与 DigiMesh 对比白皮书 查看 PDF FLO 福楼®电动汽车充电网络 FLO 公司的前身是 AddÉnergie,主要开发、制造和运营电动汽车充电解决方案,面向的细分市场包括... 阅读故事